Skip to main content

125th Anniversary School Ball

The Event

Farnborough Hill School’s 125th Anniversary Winter School Ball – seated dinner for 200.

The Challenge

The event was to take place in their recently built school sports hall. This presented a number of issues including tight access, weight loading need to be spread in order to protect the flooring and a large build in tight space conditions. The client also requested internal dressing of the main reception entrance to the sports hall and corridors to the loo area.

The Solution

A 12m x 27m main structure, a walkway reception area and a 6m x 12m catering facility. Internally we supplied hardwood flooring, carpet, dancefloor, furniture, staging for live band and all associated power requirements. The lighting was a mix of chandeliers, uplighters and black starlight roof linings. The schools colours of lilac and green were also supplied for the dressing of the marquee.

Client
Industry sector

School

Location

Farnborough

Rental Period

Four Days

× How can I help you?